ARE-Energy 3 MW AC/DC Power Plant
Passes 2,000 Hour Mark with Dependable
Power Delivery.
The American Pulverize 84 x 104 Shredder
Is Powered by ARE-Energy Power Plant
The heart of the Power Plant Unit is the dependability
Of the GE Robust Medium Speed Engine
All of the major pieces, the generator, turbo, and engine
were Re-manufactured equal to, or exceeding, original specification.
The AC power is rectified to DC power for
two 2 EMD 2,000 H.P. Converted Motors
The cooling system draws clean fresh air
Outside the Building.
Bio-diesel, with incremental increases, is the
Primary fuel. Currently the unit is using B-75
ASTM 6751 Biodiesel.